MA – Nov 2024 – L2 – Q5a – Limiting Factor Decision and Profit Maximization

Determination of the optimum production plan considering scarce resources.

Manche produces two products from different quantities of the same resources using a just-in-time (JIT) production system. The selling price and resource requirements of each of the products are shown below:

Product C L
Unit Selling Price (GH¢) 130 160
Resources per Unit:
Direct Labour (GH¢8 per hour) 3 hours 5 hours
Material A (GH¢3 per kg) 5 kg 4 kg
Material B (GH¢7 per litre) 2 litres 1 litre
Machine Hours (GH¢10 per hour) 3 hours 4 hours
Fixed Overhead (GH¢8 per hour) 1 hour 1 hour

Market research shows that the maximum demand for products C and L during August 2024 is 500 units and 800 units respectively. This does not include an order that Manche has agreed with a commercial customer for the supply of 250 units of C and 350 units of L at selling prices of GH¢100 and GH¢135 per unit, respectively. Failure by Manche to deliver the order in full by the end of August will cause Manche to incur a GH¢5,000 financial penalty.

At a recent meeting between the Purchasing Manager and Production Manager to discuss the production plans of C and L for August, the following resource restrictions for the year were identified:

  • Direct Labour Hours: 90,000 hours
  • Machine Hours: 90,000 hours

The resource restrictions were evenly distributed throughout the year.

Required:

i) Prepare the optimum production plan for August 2024 using relevant computations. 
ii) Determine the contribution from adopting this plan. 
iii) Using relevant computations, show whether Manche should complete the order from the commercial customer assuming any excess labour hours for not making the contract can be used to produce 300 units of product ‘F’ with a contribution of GH¢55 per unit.

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MA – Nov 2024 – L2 – Q5a – Limiting Factor Decision and Profit Maximization"

PM – May 2021 – L2 – Q2 – Budgeting and Budgetary Control

Recommend the appropriate forecast for PQR Plc, analyze the limiting factor, and explain the budgeting process.

PQR Plc is preparing its budgets for the upcoming year and has forecasted two demand scenarios for its product range:

You are to assume only one forecast (either Forecast 1 or Forecast 2) will be selected. The expected variable unit costs for each product are:

The general fixed costs are budgeted at ₦20,000 for the year, with no specific fixed costs expected per product. Additionally, all three products use the same direct material, with a limited supply of 22,020 kgs available for the budget year.

Required:
a. Recommend, with supporting calculations, whether forecast 1 or forecast 2 should be adopted for the budget period. (11 Marks)
b. Prepare a report, addressed to the managing director, to explain the budget preparation process, with particular reference to: i. The principal budget factor (3 Marks)
ii. The budget manual (3 Marks)
iii. The role of the budget committee (3 Marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "PM – May 2021 – L2 – Q2 – Budgeting and Budgetary Control"

MA – May 2016 – L2 – Q5b – Decision Making Techniques, Relevant Cost and Revenue, Divisional Performance

Decision Making Techniques, Relevant Cost and Revenue, Divisional Performance

Unity Company Ltd is preparing for next season’s operations. The company has provided the following information relating to its three products:

TO GE DA
Selling Price GH¢18.5 GH¢16.2 GH¢12.6
Material Cost (@ GH¢1.75 per kg) GH¢8.75 GH¢10.5 GH¢3.5
Labour Cost (@ GH¢2.2 per labour hour) GH¢7.7 GH¢4.4 GH¢7.7
Annual Demand 2,150 units 3,235 units 1,556 units

The company can only make available a total of 18,560 hours in the short run.

Required:

i) Provide the optimal production plan for Unity Ltd for the ensuing period.
(5 marks)

ii) What is the total incremental benefit of producing DA instead of GE, assuming available resources can only meet the demand for DA?
(3 marks)

iii) Indicate the shadow price of the production plan and state the basic assumption under which this price will apply.
(2 marks)

 

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MA – May 2016 – L2 – Q5b – Decision Making Techniques, Relevant Cost and Revenue, Divisional Performance"

MA – Nov 2024 – L2 – Q5a – Limiting Factor Decision and Profit Maximization

Determination of the optimum production plan considering scarce resources.

Manche produces two products from different quantities of the same resources using a just-in-time (JIT) production system. The selling price and resource requirements of each of the products are shown below:

Product C L
Unit Selling Price (GH¢) 130 160
Resources per Unit:
Direct Labour (GH¢8 per hour) 3 hours 5 hours
Material A (GH¢3 per kg) 5 kg 4 kg
Material B (GH¢7 per litre) 2 litres 1 litre
Machine Hours (GH¢10 per hour) 3 hours 4 hours
Fixed Overhead (GH¢8 per hour) 1 hour 1 hour

Market research shows that the maximum demand for products C and L during August 2024 is 500 units and 800 units respectively. This does not include an order that Manche has agreed with a commercial customer for the supply of 250 units of C and 350 units of L at selling prices of GH¢100 and GH¢135 per unit, respectively. Failure by Manche to deliver the order in full by the end of August will cause Manche to incur a GH¢5,000 financial penalty.

At a recent meeting between the Purchasing Manager and Production Manager to discuss the production plans of C and L for August, the following resource restrictions for the year were identified:

  • Direct Labour Hours: 90,000 hours
  • Machine Hours: 90,000 hours

The resource restrictions were evenly distributed throughout the year.

Required:

i) Prepare the optimum production plan for August 2024 using relevant computations. 
ii) Determine the contribution from adopting this plan. 
iii) Using relevant computations, show whether Manche should complete the order from the commercial customer assuming any excess labour hours for not making the contract can be used to produce 300 units of product ‘F’ with a contribution of GH¢55 per unit.

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MA – Nov 2024 – L2 – Q5a – Limiting Factor Decision and Profit Maximization"

PM – May 2021 – L2 – Q2 – Budgeting and Budgetary Control

Recommend the appropriate forecast for PQR Plc, analyze the limiting factor, and explain the budgeting process.

PQR Plc is preparing its budgets for the upcoming year and has forecasted two demand scenarios for its product range:

You are to assume only one forecast (either Forecast 1 or Forecast 2) will be selected. The expected variable unit costs for each product are:

The general fixed costs are budgeted at ₦20,000 for the year, with no specific fixed costs expected per product. Additionally, all three products use the same direct material, with a limited supply of 22,020 kgs available for the budget year.

Required:
a. Recommend, with supporting calculations, whether forecast 1 or forecast 2 should be adopted for the budget period. (11 Marks)
b. Prepare a report, addressed to the managing director, to explain the budget preparation process, with particular reference to: i. The principal budget factor (3 Marks)
ii. The budget manual (3 Marks)
iii. The role of the budget committee (3 Marks)

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "PM – May 2021 – L2 – Q2 – Budgeting and Budgetary Control"

MA – May 2016 – L2 – Q5b – Decision Making Techniques, Relevant Cost and Revenue, Divisional Performance

Decision Making Techniques, Relevant Cost and Revenue, Divisional Performance

Unity Company Ltd is preparing for next season’s operations. The company has provided the following information relating to its three products:

TO GE DA
Selling Price GH¢18.5 GH¢16.2 GH¢12.6
Material Cost (@ GH¢1.75 per kg) GH¢8.75 GH¢10.5 GH¢3.5
Labour Cost (@ GH¢2.2 per labour hour) GH¢7.7 GH¢4.4 GH¢7.7
Annual Demand 2,150 units 3,235 units 1,556 units

The company can only make available a total of 18,560 hours in the short run.

Required:

i) Provide the optimal production plan for Unity Ltd for the ensuing period.
(5 marks)

ii) What is the total incremental benefit of producing DA instead of GE, assuming available resources can only meet the demand for DA?
(3 marks)

iii) Indicate the shadow price of the production plan and state the basic assumption under which this price will apply.
(2 marks)

 

Login or create a free account to see answers

Find Related Questions by Tags, levels, etc.

Report an error

You're reporting an error for "MA – May 2016 – L2 – Q5b – Decision Making Techniques, Relevant Cost and Revenue, Divisional Performance"

Oops!

This feature is only available in selected plans.

Click on the login button below to login if you’re already subscribed to a plan or click on the upgrade button below to upgrade your current plan.

If you’re not subscribed to a plan, click on the button below to choose a plan