- 5 Marks
Question
State THREE problems associated with site and contract work and list TWO ways to mitigate against them.
Answer
- Problems associated with site and contract work:
- Pilferage of materials, tools, and fuel: There is a risk of theft and unauthorized use of resources at construction sites due to the large number of people and equipment involved.
- Unauthorized use of equipment and vehicles: On-site machinery and vehicles may be used without proper authorization, leading to wear and tear or unplanned expenses.
- Wasteful use of materials: Inefficiencies in handling materials can lead to wastage, which impacts the cost control and profitability of the contract.
- Ways to mitigate these problems:
- Effective site security and management: Implement strong security protocols and assign competent site managers to oversee operations and prevent pilferage.
- Clear documentation and tracking: Maintain proper records of equipment usage and material consumption, and ensure regular inventory checks to avoid unauthorized usage and waste.
- Tags: Contract Costing, Site Management
- Level: Level 1
- Topic: Costing Methods
- Series: MAY 2022
- Uploader: Kwame Aikins